SMP-056

Pleasantville Elementary School

Pleasantville Elementary School
Houston Independent School District
1431 Gellhorn
Houston, TX 77029

The school underwent a complete renovation and abatement of the existing facility. Patriot’s team also painted the interior and installed new ceramic tile, VCT tile and carpet tile throughout the entire building. Technical installations included new primary and secondary electrical service to the boiler room and a new fire alarm system. A new wheelchair elevator was also installed to the new stage, and all doors and windows were replaced.

Exterior work included a new roof to the cafeteria, additional storm water system with a new drop off canopy and a new concrete drive with extra parking space at the entrance.

  • 12 month project
  • Contract Value of $5.8 million

2007 Bond School

Gallegos Elementary School

Gallegos Elementary School

Houston Independent School District
7415 Harrisburg
Houston, TX 77011

Project consists of upgrades and renovations to the existing 73,000 square foot facility. Interior work included new HVAC system with all new digital controls, new floors and paint in more than 40 classrooms and bringing bathrooms and other features up to ADA compliance.

Exterior work included a new roof, parking lot and extended fire lane.

  • 12 month project
  • Contract value of $2.2 million

xSMP original -106

Carnegie Vanguard High School

Houston Independent School District
1501 Taft
Houston, TX 77019

Project included a complete renovation and build-out of the historic Settegast Estate building into the school’s new Art Annex. Additionally, Patriot built a new rehearsal hall, art studios and an outdoor amphitheater. They also helped raise seating and made upgrades to the inside theater’s stage for the performing arts students.

  • 9 month project
  • Contract Value $2 million

Sylvan Rodriguez Elementary School

Sylvan Rodriguez Elementary

Sylvan Rodriguez Elementary School
Houston Independent School District
5858 Chimney Rock Road
Houston, TX 77081

Project consists of a new 105,000 square foot facility, as well as new landscaping and courtyard. Work included demolition of the existing facility, offsite entry modifications and various sitework issues.

  • 12-13 month project
  • Contract value of $9.7 million

Gregory Lincoln Education Center

Gregory Lincoln Education

Houston Independent School District
1101 Taft
Houston, TX 77019
Project consists of the replacement of the existing facility including complete abatement and demolition of the existing 2-story buildings.

  • 119,000 square feet
  • 12-13 month project contract
  • Value of $13.2 million